Home Leadership Lean Six Sigma Must Be A Waste Of Energy

Lean Six Sigma Must Be A Waste Of Energy

13 min read
0
0
152

It is important to note that these are “roles” with corresponding responsibilities to which I am referring – and not necessarily positions or titles. It is also important to understand why I refer to the roles as “stratifications” of a workforce and not slices in a pie-chart. Quite simply, the stratifications represent value (real or perceived) being driven to the organization – with those in “Leadership” roles driving more value to the organization and its efforts than those (incrementally) of other stratifications. A pie-chart would not demonstrate this adequately.

Pages 1 2 3 4 5 6 7 8
Download Article 1K Club
Load More Related Articles
Load More By Joseph Paris Jr.
Load More In Leadership

Leave a Reply

Your email address will not be published. Required fields are marked *

Check Also

Organizational Changes Survey: Summary of Findings

An online survey was conducted regarding Organizational Changes and the implications of th…